Commercial / Industrial
| Client: Scottish Power | ![]() |
| Project: Southern Regional HQ - Prenton | |
| Value: £100K | |
| Description: Chiller & dry cooler replacement, VRF & split system air conditioning, BMS. |
|
Following irreparable damage sustained in freak weather conditions, the replacement of the existing dry air cooler and multiple air conditioning systems was to be a fast track project with high priority. |
|
| Client: Scottish Power | ![]() |
| Project: Scottish Grid HQ - Kirkintilloch | |
| Value: £186K | |
| Description: VRF & split system air conditioning & ventilation. |
|
This project comprised of the refurbishment a two storey building incorporating VRF air conditioning, split system heat pumps and tempered fresh air ventilation. |
|
| Client: Northrop Grumman | ![]() |
| Project: UK Diagnostic Facility | |
| Value: £265K | |
| Description: Installation of close controls & VRF comfort cooling & heat recovery ventilation. |
|
This project comprised of the installation of fresh air conditioning to diagnostic test rooms which required clean room type environments. |
|


